Measuring
Value-at-Risk in Project Finance Transactions
Mengukur Nilai Risiko atas Transaksi Keuangan Proyek
Abstract
Despite
the remarkable importance of project finance in international financial markets,
no quantitative models to measure and quantify the risk associated with a deal
for the project’s lenders have been developed yet. The topic has recently become
crucial, since the New Basle Capital Accord gives banks a choice of whether to
adopt simpler (but possibly higher) standard capital requirements or to develop
internal rating models for project finance transactions. The paper proposes how
Monte Carlo simulations may be used to derive a Value-at-Risk estimate for
project finance deals and discusses the critical issues that must be considered
when developing such a model.
Keywords:
project finance, VaR, credit risk
management
Abstrak
Meskipun pentingnya luar biasa dari
pembiayaan proyek di pasar keuangan internasional, tidak ada model kuantitatif
untuk mengukur dan menghitung risiko yang terkait dengan kesepakatan untuk
pemberi pinjaman proyek.
Topik baru-baru ini menjadi penting,
karena New Basel Capital Accord memberikan bank pilihan apakah akan mengadopsi
sederhana (tapi mungkin lebih tinggi) persyaratan modal standar atau untuk mengembangkan
model internal rating untuk transaksi pembiayaan proyek.
Makalah ini mengusulkan bagaimana
simulasi Monte Carlo dapat digunakan untuk memperoleh nilai di estimasi Risiko
penawaran pembiayaan proyek dan membahas isu-isu penting yang harus dipertimbangkan
ketika mengembangkan model seperti itu.
Kata kunci: Proyek keuangan, VaR,
manajemen risiko kredit
1.
Introduction
It is well
known that project finance is a multi-billion dollar business. According to
Hainz and Kleimeier (2003), the value of the deals closed in the January
1980–March 2003 period was about 960 USD billion (equal to 5% of the total
syndicated loans allowed worldwide in the same period). Many of these deals are
concentrated in developing countries, where project finance is increasingly
considered to be a viable and efficient solution for limited infrastructure
investments. Project finance is also widely used to fund oil, gas, power and
telecom projects (Kensinger and Martin, 1988; Gadanecz and Sorge, 2004).
1. Perkenalan
Hal ini juga diketahui bahwa pembiayaan
proyek adalah bisnis multi miliar dolar.
Menurut Hainz dan Kleimeier (2003),
nilai penawaran ditutup pada periode Januari 1980-Maret 2003 adalah sekitar 960
miliar dolar AS (setara dengan 5% dari total kredit sindikasi diperbolehkan di
seluruh dunia pada periode yang sama).
Banyak dari kesepakatan tersebut
terkonsentrasi di negara-negara berkembang, di mana pembiayaan proyek semakin
dianggap sebagai solusi yang layak dan efisien untuk investasi infrastruktur
yang terbatas.
Pembiayaan proyek juga banyak digunakan
untuk mendanai minyak, gas, listrik dan proyek-proyek telekomunikasi (Kensinger
dan Martin, 1988; Gadanecz dan Sorge, 2004).
Project
finance typically involves highly capital intensive projects with investments characterised
by a lowlevel of redeployability (Habib and Johnsen, 1999), in nations with significant
country risk1 and a highly-leveraged capital structure. These characteristics make
it critical for bank lenders to value the credit risk behind these kinds of
deals.
Pembiayaan proyek biasanya melibatkan
proyek padat modal dengan investasi yang sangat ditandai dengan rendahnya
tingkat redeployability (Habib dan Johnsen, 1999), di negara-negara dengan
risiko negara yang signifikan dan struktur modal yang sangat leveraged.
Karakteristik ini membuatnya menjadi penting bagi bank pemberi pinjaman untuk
menilai risiko kredit balik semacam ini penawaran.
In the
past few years, the topic of credit risk valuation from the perspective of a bank
lender has been subject to increased attention in the theoretical and empirical
literature. Many models have been developed to measure Value-at-Risk (VaR) for corporate
borrowers, i.e. for existing firms operating a mix of real and financial assets.
Dalam beberapa tahun terakhir, topik
penilaian risiko kredit dari perspektif pemberi pinjaman bank yang telah
dikenakan meningkatnya perhatian dalam literatur teoritis dan empiris. Banyak
model yang telah dikembangkan untuk mengukur nilai-at-Risk (VaR) untuk peminjam
perusahaan, yaitu untuk perusahaan yang ada operasi campuran aset riil dan
keuangan.
VaR is
defined as the maximum potential loss that may be faced by a portfolio or by a
financial institution within a certain time interval and that can be exceeded
only in a given α% (e.g., 1%) of cases. The models of analysis are
typically based on the two key concepts of expected loss (EL) and unexpected
loss (UL). Expected loss is the amount that on average will not be repaid to
the lender, and is determined as the product of exposure at default (EAD) times
the probability of default (PD) times the loss given default (LGD). While
expected loss identifies the average amount of money the bank is supposed to
lose, a lender should allocate enough capital to face potentially higher losses
that may occur in cases where exposure at default is higher than expected (as when
the counterparty has the chance to take full advantage of a stand-by facility
before defaulting) or default frequency is higher than expected, or loss in the
event of default exceeds ex ante estimates. This extra loss that the
bank may face in the worst possible scenario at a given confidence level is
identified as unexpected loss, and coincides with the VaR of the exposure.
VaR didefinisikan sebagai potensi
kerugian maksimum yang mungkin dihadapi oleh portofolio atau oleh lembaga
keuangan dalam interval waktu tertentu dan yang dapat melebihi hanya diberikan
α% (misalnya, 1%) kasus. Model analisis biasanya didasarkan pada dua konsep
utama hilangnya diharapkan (EL) dan kerugian yang tidak terduga (UL). Kerugian
yang diperkirakan adalah jumlah yang rata-rata tidak akan dibayarkan kepada
pemberi pinjaman, dan ditentukan sebagai produk dari paparan di default (EAD)
kali probabilitas default (PD) kali kehilangan given default (LGD). Sementara
kerugian yang diperkirakan mengidentifikasi jumlah rata-rata uang bank
seharusnya kalah, pemberi pinjaman harus mengalokasikan modal yang cukup untuk
menghadapi kerugian potensial lebih tinggi yang mungkin terjadi dalam kasus di
mana paparan di default lebih tinggi dari yang diharapkan (seperti ketika
counterparty memiliki kesempatan untuk mengambil keuntungan penuh dari
fasilitas stand by sebelum default) atau standar frekuensi yang lebih tinggi
dari yang diharapkan, atau kerugian dalam hal terjadi default melebihi
perkiraan ex ante. Kerugian tambahan ini bahwa bank mungkin menghadapi dalam
skenario terburuk pada tingkat kepercayaan tertentu diidentifikasi sebagai
kerugian yang tidak terduga, dan bertepatan dengan VaR dari paparan.
Unfortunately,
the models developed for valuing credit risk for common loans cannot be
directly applied to project finance transactions, since these deals are
actually characterised by a number of peculiar aspects (Esty, 2004).
Sayangnya, model yang dikembangkan
untuk menilai risiko kredit untuk pinjaman umum tidak dapat langsung diterapkan
untuk proyek transaksi keuangan, karena penawaran ini sebenarnya ditandai oleh
sejumlah aspek yang aneh (Esty, 2004).
First,
project finance is a special form of off-balance sheet financing based on the segregation
of the project into a Special Purpose Vehicle (SPV) with limited or no recourse
towards its shareholders (called sponsors). The SPV designs and operates the
project through a nexus of contracts (Dailami and Hauswald, 2001) with many different
key counterparties (contractors, purchasers, suppliers, operators, etc.). Esty (2003)
observes that in a typical project finance transaction there are on average 15
parties linked to the SPV by at least 40 different agreements.
Second,
and as a natural consequence of segregating the project in an SPV, lenders cannot
rely on the assets or cash flows of the SPV sponsors, but solely (or mainly) on
the cash flows generated by the project.
Third,
the size of project finance is larger than normal corporate loans. Megginson
and Kleimeier (2000) report an average project finance loan size of 128 USD
million, which is markedly higher than general purpose corporate loans (108 USD
million) granted to ongoing corporations.
Fourth,
the transaction makes use of a higher debt-to-equity ratio than regular corporate
loans. Esty (2002), for example, records a value of 33.1% for normal firms versus
70% for SPVs.
Fifth,
the maturity of project finance deals is longer than normal corporate loans. In
the sample used by Megginson and Kleimeier (2000), the average maturity of a project
finance loan was 8.6 years, versus 4.8 years for the whole sample of loans and 4.5
years for general purpose corporate loans. In the case of project finance deals
with loan tranches over 500 USD million, Esty and Megginson (2003) found
average maturity equal to 10.2 years. In their study on the international
project bond market, Dailami and Hauswald (2003) report similar results with an
average maturity of 11.82 years up to a maximum of 100 years.
Pertama, pembiayaan proyek adalah
bentuk khusus pembiayaan dari neraca berdasarkan pemisahan proyek menjadi
Special Purpose Vehicle (SPV) dengan terbatas atau tidak ada jalan terhadap
pemegang saham (disebut sponsor). Desain SPV dan mengoperasikan proyek melalui
perhubungan kontrak (Dailami dan Hauswald, 2001) dengan berbagai counterparty
yang berbeda kunci (kontraktor, pembeli, pemasok, operator, dll). Esty (2003)
mengamati bahwa dalam transaksi pembiayaan proyek yang khas terdapat rata-rata
15 pihak terkait dengan SPV oleh setidaknya 40 perjanjian yang berbeda.
Kedua, dan sebagai konsekuensi alami
dari pemisahan proyek dalam SPV, pemberi pinjaman tidak bisa mengandalkan aset
atau arus kas dari sponsor SPV, tapi semata-mata (atau terutama) di arus kas
yang dihasilkan oleh proyek.
Ketiga, ukuran pembiayaan proyek lebih
besar dari kredit korporasi yang normal. Megginson dan Kleimeier (2000)
melaporkan ukuran pinjaman pembiayaan proyek rata-rata 128 USD juta, yang nyata
lebih tinggi dibandingkan kredit korporasi tujuan umum (108 USD juta) diberikan
kepada perusahaan-perusahaan yang sedang berlangsung.
Keempat, transaksi yang menggunakan
lebih tinggi rasio utang terhadap ekuitas dari pinjaman korporasi biasa. Esty
(2002), misalnya, mencatat nilai 33,1% untuk perusahaan yang normal dibandingkan
70% untuk SPV.
Kelima, kematangan penawaran pembiayaan
proyek lebih panjang dari pinjaman korporasi yang normal. Dalam sampel yang
digunakan oleh Megginson dan Kleimeier (2000), jatuh tempo rata-rata pinjaman
pembiayaan proyek adalah 8,6 tahun, dibandingkan 4,8 tahun untuk seluruh sampel
pinjaman dan 4,5 tahun untuk kredit korporasi tujuan umum. Dalam kasus
penawaran pembiayaan proyek dengan tahapan pinjaman lebih dari 500 juta USD,
Esty dan Megginson (2003) menemukan rata-rata jatuh tempo sebesar 10,2 tahun.
Dalam studi mereka pada pasar obligasi proyek internasional, Dailami dan
Hauswald (2003) melaporkan hasil yang sama dengan jatuh tempo rata-rata 11,82
tahun sampai dengan maksimal 100 tahun.
These
five special characteristics of project finance have important consequences for
a lender. The contractual nature of project finance implies that the credit
risk valuation must consider both project performance and the soundness and
creditworthiness of each counterparty linked to the SPV. A separation of these
two components is always difficult and somewhat arbitrary. On the other hand,
each project finance deal is in some way unique in terms of location and
contractual complexity. The way in which each deal is structured, so to
properly allocate risks among different parties, can hardly be standardised. As
a consequence, a lender can hardly rely on the historical estimates of PD and
LGD derived from its corporate loans portfolio. Finally, the lender’s risk evaluation
is more difficult for long-maturity loans, especially when the project is still
on paper with no past history.
Kelima karakteristik khusus pembiayaan
proyek memiliki konsekuensi penting bagi pemberi pinjaman. Sifat kontrak
pembiayaan proyek menyiratkan bahwa penilaian risiko kredit harus
mempertimbangkan baik kinerja proyek dan tingkat kesehatan dan kelayakan kredit
dari masing-masing rekanan terkait dengan SPV. Sebuah pemisahan dua komponen
ini selalu sulit dan agak sewenang-wenang. Di sisi lain, setiap transaksi
pembiayaan proyek dalam beberapa cara yang unik dari segi lokasi dan
kompleksitas kontrak. Cara di mana setiap kesepakatan terstruktur, sehingga
untuk benar mengalokasikan risiko antara pihak yang berbeda, hampir tidak dapat
dibakukan. Akibatnya, pemberi pinjaman tidak dapat mengandalkan perkiraan
sejarah PD dan LGD berasal dari portofolio kredit korporasi. Akhirnya, evaluasi
risiko pemberi pinjaman lebih sulit untuk pinjaman jangka panjang jatuh tempo,
terutama ketika proyek tersebut masih di atas kertas yang tidak memiliki riwayat
masa lalu.
Notwithstanding
the importance of project finance in the international financial markets, bank
lenders cannot rely on the solutions to the problem of project finance credit risk
provided by the literature, since it still remains scarce. Well aware of this
problem, bank regulators have begun to dedicate more attention to the profound
differences between corporate exposure and project finance loans. The
peculiarity of project finance deals was particularly evidenced in the
recently-issued Basel New Capital Accord (Basel Committee on Banking
Supervision, 2004). The New Capital Accord is relevant in this context since it
defines the new set of rules for the definition of bank minimum regulatory
requirements either by applying standard requirements or by using banks’ internal
VaR models under a defined set of qualitative and quantitative requirements and
after a careful validation process by regulatory authorities.
Meskipun pentingnya pembiayaan proyek
di pasar keuangan internasional, bank pemberi pinjaman tidak bisa mengandalkan
solusi untuk masalah risiko kredit pembiayaan proyek disediakan oleh literatur,
karena masih tetap langka. Menyadari masalah ini, regulator bank telah mulai
memberikan perhatian lebih terhadap perbedaan mendalam antara paparan
perusahaan dan pinjaman pembiayaan proyek. Keunikan dari penawaran pembiayaan
proyek ini terutama dibuktikan dalam baru dikeluarkan Basel New Capital Accord
(Basel Committee on Banking Supervision, 2004). The New Capital Accord relevan
dalam konteks ini karena mendefinisikan set baru aturan untuk definisi
persyaratan peraturan minimum perbankan baik dengan menerapkan persyaratan
standar atau dengan menggunakan model VaR internal yang bank di bawah satu set
didefinisikan persyaratan kualitatif dan kuantitatif dan setelah hati-hati
proses validasi oleh otoritas pengawas.
The Basel
Committee links specialised lending deals4 in general with the corporate portfolio,
applying the same rules to both categories. On the other hand, specific guidelines
are provided by the Committee for classifying projects according to the slotting
criteria approach, and in this case rules are given to label a deal across
a range of categories from strong to default. The approach is very similar to
those of the rating agencies, with a strong judgmental component in the
evaluation of the transaction.
Komite Basel menghubungkan penawaran
pinjaman khusus pada umumnya dengan portofolio perusahaan, menerapkan aturan
yang sama untuk kedua kategori. Di sisi lain, pedoman khusus disediakan oleh
Komite untuk mengklasifikasikan proyek sesuai dengan pendekatan kriteria
slotting, dan dalam hal ini aturan yang diberikan untuk label kesepakatan di
berbagai kategori dari kuat untuk default. Pendekatan ini sangat mirip dengan
orang-orang dari lembaga pemeringkat, dengan komponen menghakimi kuat dalam
evaluasi transaksi.
The
alternative solution proposed by the Committee allows banks to apply the
Internal Rating Based (IRB) approach to calculate the probability of default
(PD), the loss given default (LGD) and the exposure at default (EAD) of a
project finance loan. In this case, the Committee suggests applying to
specialised lending the internal rating solution used in the advanced approach
for corporate exposures. However, the point of view of the Committee raises
some doubts about the recognition of the special features of project finance
compared to corporate exposures. The peculiarities of projects, compared with standard
corporate exposures, should actually influence the definition of default and
the estimate of default probabilities, recoveries and exposures used to
classify the risk of these transactions.
Alternatif solusi yang diusulkan oleh
Komite memungkinkan bank untuk menerapkan Internal Rating Based (IRB)
pendekatan untuk menghitung probabilitas default (PD), kerugian given default
(LGD) dan paparan di default (EAD) dari pinjaman pembiayaan proyek. Dalam hal
ini, Komite menyarankan berlaku untuk khusus pinjaman solusi rating internal
yang digunakan dalam pendekatan canggih untuk eksposur perusahaan. Namun, titik
pandang Komite menimbulkan beberapa keraguan tentang pengakuan fitur khusus
pembiayaan proyek dibandingkan dengan eksposur perusahaan. Kekhasan proyek,
dibandingkan dengan eksposur perusahaan standar, harus benar-benar mempengaruhi
definisi standar dan estimasi probabilitas default, pemulihan dan eksposur yang
digunakan untuk mengklasifikasikan risiko transaksi ini.
In short,
the evaluation of the credit risk of a project finance deal and the measurement
of the consequent VaR is a topic that, while relevant per se, is
particularly important in this specific phase, when major banks may be willing
to develop an internal model alternative to the standard risk weights, which
are generally perceived to be too capital demanding.
Singkatnya, evaluasi risiko kredit
kesepakatan pembiayaan proyek dan pengukuran VaR akibat adalah topik yang,
sementara relevan per se, sangat penting dalam fase tertentu, ketika bank-bank
besar mungkin bersedia untuk mengembangkan model internal alternatif untuk
bobot risiko standar, yang umumnya dianggap terlalu menuntut modal
The main
objective of this paper is to suggest a possible way to measure VaR in project finance
deals, based on Monte Carlo simulations. In particular, we shall: (i) show how default
could be identified through a multi-year simulation of the project cash flows; (ii)
discuss how inputs could be estimated and the problems deriving from the
existence of asymmetric information among different players; and (iii) suggest
how a synthetic VaR measure can be derived so as to summarise the entire
cash-flow simulation in a number which might be consistent with the VaR figures
for corporate loans. While recent contributions have proposed that simulations
be adopted to assess the risk from the sponsors’ viewpoint (Dailami et al.,
1999), we extend the method to the lender’s position, and address the specific
issues that must be tackled so to produce a VaR estimate.
Tujuan utama dari makalah ini adalah
untuk menunjukkan cara yang mungkin untuk mengukur VaR dalam penawaran
pembiayaan proyek, berdasarkan simulasi Monte Carlo. Secara khusus, kita harus:
(i) menunjukkan bagaimana standar dapat diidentifikasi melalui simulasi
multi-tahun dari arus kas proyek; (ii) membahas bagaimana input dapat
diperkirakan dan masalah-masalah yang berasal dari adanya informasi asimetris
antara pemain yang berbeda; dan (iii) menunjukkan bagaimana ukuran VaR sintetis
dapat diturunkan sehingga meringkas simulasi arus kas seluruh di sejumlah yang
mungkin konsisten dengan angka VaR untuk kredit korporasi. Sementara kontribusi
baru-baru ini telah mengusulkan bahwa simulasi diadopsi untuk menilai risiko
dari sudut pandang sponsor '(Dailami et al., 1999), kami memperluas metode
untuk posisi pemberi pinjaman, dan mengatasi isu-isu spesifik yang harus
ditangani sehingga untuk menghasilkan VaR perkiraan
Our
approach is mainly addressed to banks involved in the business of project
finance and to rating agencies and regulators concerned with the estimation of
project credit risk. The basic guidelines of the proposed approach may also be
of interest to sponsors willing to structure the project in order to limit the
credit risk from the lenders’ viewpoint and consequently the cost of funding
the project.
The paper
is structured as follows. The next section focuses on the definition of default
events in project finance transactions. Section 3 analyses how to model the
uncertain cash flows of the project through a Monte Carlo simulation. Section 4
discusses the problem of identifying VaR in a project finance transaction,
while Section 5 discusses how loss given default may be modelled. Section 6
summarises the potential advantages of adopting a simulation approach and
concludes the paper.
Pendekatan kami terutama ditujukan
kepada bank-bank yang terlibat dalam bisnis pembiayaan proyek dan lembaga
pemeringkat dan regulator yang bersangkutan dengan estimasi risiko kredit
proyek. Pedoman dasar pendekatan yang diusulkan juga mungkin menarik bagi sponsor
yang bersedia untuk struktur proyek untuk membatasi risiko kredit dari sudut
pandang pemberi pinjaman dan akibatnya biaya pendanaan proyek.
Makalah ini disusun sebagai berikut.
Bagian berikutnya berfokus pada definisi peristiwa standar dalam transaksi
pembiayaan proyek. Bagian 3 menganalisis bagaimana model arus kas yang tidak
pasti dari proyek melalui simulasi Monte Carlo. Bagian 4 membahas masalah
identifikasi VaR dalam transaksi pembiayaan proyek, sementara Bagian 5 membahas
bagaimana loss given default dapat dimodelkan. Bagian 6 merangkum potensi
keuntungan mengadopsi pendekatan simulasi dan menyimpulkan kertas.
2.
Defining Default for Project Finance Deals
The
definition of default and the consequent quantification of default risk have
always been critical in the literature on corporate finance and credit risk
measurement. Even in the case of project finance, the first step is to clearly
identify what default is. Unfortunately, definitions devised for corporations
or financial institutions may hardly be applied in this field.
2. Mendefinisikan kegagalan untuk
Penawaran Pembiayaan Proyek
Definisi kegagalan dan kuantifikasi
akibat risiko bawaan selalu penting dalam literatur keuangan perusahaan dan
pengukuran risiko kredit. Bahkan dalam kasus pembiayaan proyek, langkah pertama
adalah untuk secara jelas mengidentifikasi apa yang default. Sayangnya,
definisi dirancang untuk perusahaan atau lembaga keuangan mungkin tidak dapat
diterapkan di bidang ini.
The first
key step in quantifying default risk for project finance transactions is to model
the cash flows that the project will produce. For corporations, following the various
models that have been developed according to the Merton’s (1974) framework, default
is expected to occur when the value of the firm’s assets falls below a certain threshold.
A similar analysis may be conducted with reference to the project cash flows, so
that default may occur when the cash flows from the project become insufficient
to repay the debt service in a given period. It may be difficult to determine,
however, whether this condition has occurred. Lenders typically try to reduce
their risk by forcing the SPV to build cash reserve accounts (in the form of a
DSRA, debt service reserve account, covering a pre-defined number of principal
and interest repayments), or by linking the possibility to extract cash flows
from the project to the maintenance of appropriate levels for ratios such as
the debt service cover ratio (DSCR) and loan life cover ratio (LLCR). Checking
whether default actually occurs therefore requires developing a stepwise
analysis.
Langkah
penting pertama dalam mengukur risiko default untuk transaksi pembiayaan proyek
adalah model arus kas bahwa proyek ini akan menghasilkan. Untuk perusahaan,
mengikuti berbagai model yang telah dikembangkan sesuai dengan (1974) kerangka
Merton, default diharapkan terjadi ketika nilai aset perusahaan turun di bawah
ambang batas tertentu. Sebuah analisis yang sama dapat dilakukan dengan mengacu
pada arus kas proyek, sehingga standar yang mungkin terjadi ketika arus kas
dari proyek menjadi tidak cukup untuk membayar utang dalam jangka waktu
tertentu. Mungkin sulit untuk menentukan, namun, apakah kondisi ini telah terjadi.
Lender biasanya mencoba untuk mengurangi risiko dengan memaksa SPV untuk
membangun rekening cadangan kas (dalam bentuk rekening DSRA, utang cadangan
layanan, yang meliputi sejumlah yang telah ditetapkan pokok dan bunga cicilan),
atau dengan menghubungkan kemungkinan untuk mengekstrak uang tunai mengalir
dari proyek untuk pemeliharaan tingkat yang sesuai untuk rasio seperti rasio
debt service penutup (DSCR) dan rasio penutup kehidupan pinjaman (LLCR).
Memeriksa apakah standar benar-benar terjadi karena itu memerlukan
mengembangkan analisis bertahap.
Thinking
about the typical cash flow waterfall of projects, we can state that a project is
defaulting when the cash flow generated from operations or outstanding debt
reserves or stand-by equity or stand-by credit lines is insufficient to service
the debt. This check has to be performed through the stepwise analysis
described in Figure 1.
Fig. 1.
Steps to default in project finance.
Berpikir tentang air terjun arus kas
khas proyek, kita dapat menyatakan bahwa sebuah proyek default ketika arus kas
yang dihasilkan dari operasi atau cadangan hutang atau stand by ekuitas atau
stand-by jalur kredit tidak mencukupi untuk membayar hutang tersebut.
Pemeriksaan ini harus dilakukan melalui analisis stepwise dijelaskan pada
Gambar 1.
Gambar. 1. Langkah-langkah ke default
dalam pembiayaan proyek
The
figure depicts the stepwise approach for the definition of project finance
default. The top part of the graph shows how through risk analysis some of the
risks are allocated to other counterparties, while only residual risk is
retained and impacts on costs and revenues. By projecting cost and revenues a simulated
cash flow can be obtained, and this enables a check on whether cash available
is sufficient to cover debt service. If this is not the case, the project does
not necessarily default, since it is necessary to check, see the bottom part of
the figure, for the existence of back up liquidity reserves (either in the form
of a DSRA, debt service reserve account, or of undrawn stand-by facilities), or
for the possibility that SPV obligations may be restructured. If there is
insufficient cash flow to service debt, there are no available cash reserves
and the obligations cannot be restructured, then the project would default.
Angka tersebut menggambarkan pendekatan
bertahap untuk definisi standar pembiayaan proyek. Bagian atas grafik
menunjukkan bagaimana melalui analisis risiko beberapa risiko dialokasikan
kepada pihak lain, sementara hanya risiko residual dipertahankan dan dampak
terhadap biaya dan pendapatan. Dengan memproyeksikan biaya dan pendapatan arus
kas simulasi dapat diperoleh, dan ini memungkinkan cek apakah kas yang tersedia
cukup untuk menutup utang. Jika hal ini tidak terjadi, proyek tidak selalu
bawaan, karena itu perlu untuk memeriksa, melihat bagian bawah gambar, keberadaan
cadangan cadangan likuiditas (baik dalam bentuk DSRA, akun cadangan utang ,
atau yang belum ditarik stand by fasilitas), atau kemungkinan bahwa kewajiban
SPV dapat direstrukturisasi. Jika ada arus kas yang cukup untuk membayar
hutang, tidak ada cadangan kas yang tersedia dan kewajiban tidak dapat
direstrukturisasi, maka proyek akan default
This
default definition can then be applied under a simulation framework. Scenarios for
the project are unknown and potentially unlimited in number and measure, but
they can be simulated to be consistent with the risk view of the bank financing
the structured deal. By projecting the cash flows for the SPV, it will then
become possible to test dynamically whether and when a default condition may
occur during the life of the project. The way in which the inputs for the
simulation can be estimated is described in the next section, and must
obviously consider all relevant elements such as market risks related to prices
and interest rates, event risks that may affect the project, the correlation among
income lines and the financing structure of the project.
Definisi standar ini kemudian dapat
diterapkan di bawah kerangka simulasi. Skenario untuk proyek tidak diketahui
dan berpotensi terbatas jumlahnya dan ukuran, tetapi mereka dapat disimulasikan
agar konsisten dengan pandangan risiko bank pembiayaan kesepakatan terstruktur.
Dengan memproyeksikan arus kas untuk SPV, maka ia akan menjadi mungkin untuk
menguji apakah secara dinamis dan ketika kondisi default dapat terjadi selama
umur proyek. Cara di mana input untuk simulasi dapat diperkirakan dijelaskan
dalam bagian berikutnya, dan jelas harus mempertimbangkan semua unsur terkait
seperti risiko pasar terkait dengan harga dan suku bunga, risiko peristiwa yang
dapat mempengaruhi proyek, korelasi antara garis pendapatan dan struktur
pembiayaan proyek
Event
risks are obviously a critical issue, where the judgmental component has a huge
effect on risk evaluation and on the probability of default estimates, since
many of the events are difficult to model (e.g. howto quantify the probability
of political deterioration in a country), while others can be related to normal
parameters used in risk management (e.g. the default probability of the sponsor
can be related to the standard rating scale used by banks to evaluate
counterparties). In general, the experience in identifying project drivers and
modelling their behaviour is very important, since even in the simulation setting
that we suggest, many parameters of the model cannot be derived from empirical evidence.
Risiko acara jelas isu kritis, di mana
komponen menghakimi memiliki pengaruh yang besar pada penilaian risiko dan
probabilitas perkiraan default, karena banyak peristiwa yang sulit untuk Model
(misalnya howto mengukur kemungkinan kerusakan politik di suatu negara),
sementara yang lain dapat berhubungan dengan parameter yang biasa digunakan
dalam manajemen risiko (misalnya probabilitas default sponsor dapat dikaitkan
dengan skala penilaian standar yang digunakan oleh bank untuk mengevaluasi
rekanan). Secara umum, pengalaman dalam mengidentifikasi driver proyek dan
pemodelan perilaku mereka sangat penting, karena bahkan dalam pengaturan
simulasi yang kami sarankan, banyak parameter model tidak dapat diturunkan dari
bukti empiris.
Due to
the complex nature of a default event in the case of project finance deals, the
simulation has to carefully monitor the values of DSCR, LLCR and the ratios of EBITDA
to senior or total debt. The breach of the pre-agreed minimum levels of these ratios
actually does not necessarily imply default directly, but they can be used as
triggers to force the sponsors to take action against credit deterioration
(e.g. through an equity injection or an increase in mitigation requirements) as
we will see later in Section 5.
Karena sifat
kompleks acara default dalam kasus transaksi keuangan proyek, simulasi harus
hati-hati memantau nilai-nilai DSCR, LLCR dan rasio EBITDA terhadap utang
senior atau keseluruhan. Pelanggaran tingkat minimum pra-disepakati rasio ini
sebenarnya tidak selalu berarti standar secara langsung, tetapi mereka dapat
digunakan sebagai pemicu untuk memaksa para sponsor untuk mengambil tindakan
terhadap penurunan kredit (misalnya melalui suntikan modal atau peningkatan
kebutuhan mitigasi) seperti yang akan kita lihat nanti dalam Bagian 5.
3. Modelling
the Project Cash Flows
The
production of a scenario in project finance deals can be viewed as a process
(see again Figure 1) that requires passing through the following stages:
1. Define
a suitable risk assessment model (risk breakdown structure);
2. Define
project variables and key drivers (project breakdown structure);
3.
Estimate input variables and respective value distribution; account for
correlations among variables;
4. Model
project cash flows, calculating outputs and valuing results.
3. Pemodelan Arus Kas Proyek
Produksi skenario dalam penawaran
pembiayaan proyek dapat dilihat sebagai suatu proses (lihat Gambar 1 lagi) yang
membutuhkan melewati tahapan sebagai berikut:
1. Tentukan model penilaian risiko yang
sesuai (kerusakan struktur risiko);
2. Menentukan variabel proyek dan
pendorong utama (kerusakan struktur proyek);
3. variabel input Perkiraan dan
distribusi nilai masing-masing; menjelaskan korelasi antara variabel;
4. Proyek Model arus kas, menghitung
output dan menilai hasil.
3.1. Define
a risk assessment model
This
process starts by identifying the key risks underlying the project (risk assessment
model) and classifying them consistently and hierarchically through the
so-called Risk Breakdown Structure (RBS).
Risk
assessment models can be either qualitative or quantitative.9 A thorough
analysis of the various models is beyond the scope of this paper, but a common
characteristic of all models is that they require some expert judgments. These
opinions are needed since projects and their execution conditions are unique,
historical information is often not statistically sufficient to perform
historical analysis, and in some cases they cannot be applied to other projects
with different targets and size.
Fig. 2.
The Risk Breakdown Structure (RBS): IPRA model.
3.1. Tentukan model penilaian risiko
Proses ini dimulai dengan
mengidentifikasi risiko utama yang mendasari proyek (model penilaian risiko)
dan mengklasifikasikan mereka konsisten dan hierarkis melalui apa yang disebut
Breakdown Risiko Struktur (RBS).
Model penilaian risiko dapat berupa
kualitatif atau quantitative.9 Sebuah analisis mendalam tentang berbagai model
berada di luar cakupan makalah ini, tetapi karakteristik umum dari semua model
adalah bahwa mereka membutuhkan beberapa pendapat para ahli. Pendapat ini
diperlukan karena proyek-proyek dan kondisi eksekusi mereka yang unik,
informasi sejarah sering statistik tidak cukup untuk melakukan analisis
sejarah, dan dalam beberapa kasus mereka tidak dapat diterapkan pada
proyek-proyek lain dengan target dan ukuran yang berbeda.
Gambar. 2. Breakdown Risiko Struktur
(RBS): Model IPRA.
A
simplified example of how a Risk Breakdown Structure can be obtained through
the International Project Risk Assessment Model (IPRA) is shown in Figure 2
(Construction Industry Institute, 2003), one of the most widely used qualitative
models. The typical first level of the RBS is composed of four sections
(Commercial, Country, Facilities, Production/Operations) plus a fifth section
on revenues that is necessary for project finance deals. Each section is then
broken down to obtain a more detailed list of project risks.
In the
IPRA model, risk assessment is based on an estimate of the likelihood of
occurrence and relative impact of each of the risks. The result is the Risk
Assessment Matrix that helps classify risks by relative importance, considering
jointly their likelihood of occurrence and impact in case of occurrence. The
resulting risk segmentation provides support in identifying key risks and thus
developing a strategy to mitigate and allocate risks to third parties (if
possible) and to manage residuals risks, in order to reduce the volatility of
the cash flow components. Risk transfer and risk mitigation strategy and the size and quality of residual risks are,
of course, crucial for the project’s evaluation from the lender’s viewpoint.
Sebuah contoh sederhana bagaimana
Struktur Breakdown Risiko dapat diperoleh melalui Model Penilaian Risiko Proyek
Internasional (IPRA) ditunjukkan pada Gambar 2 (Konstruksi Industri Institute,
2003), salah satu model kualitatif yang paling banyak digunakan. Khas tingkat
pertama dari RBS terdiri dari empat bagian (Commercial, Negara, fasilitas, Produksi
/ Operasi) ditambah bagian kelima pada pendapatan yang diperlukan untuk
penawaran pembiayaan proyek. Setiap bagian kemudian dipecah untuk mendapatkan
daftar yang lebih rinci tentang risiko proyek.
Dalam model IPRA, penilaian risiko
didasarkan pada perkiraan kemungkinan terjadinya dan dampak relatif dari
masing-masing risiko. Hasilnya adalah Matrix Penilaian Risiko yang membantu
mengklasifikasikan risiko dengan kepentingan relatif, mengingat bersama-sama
kemungkinan terjadinya dan dampak dalam hal terjadinya. Segmentasi resiko yang
dihasilkan memberikan dukungan dalam mengidentifikasi risiko utama dan dengan
demikian mengembangkan strategi untuk mengurangi risiko dan mengalokasikan
kepada pihak ketiga (jika mungkin) dan untuk mengelola risiko residual, untuk
mengurangi volatilitas komponen arus kas. Transfer risiko dan strategi mitigasi
risiko dan ukuran dan kualitas risiko residual, tentu saja, penting untuk
evaluasi proyek dari sudut pandang pemberi pinjaman.
3.2. Define
project variables and key drivers
Following
the same strategy as Risk Assessment, the Project Breakdown Structure (PBS) is
a hierarchical top-down decomposition that aims to identify all the project
variables representing the key drivers of the project’s performance/cash
flows (Archibald, 2003). One example is shown in Figure 3.
Each of
the main project variables is then broken down further into a detailed set of
project drivers representing the input variables of the cash flow model. A
complete example for a project finance deal in the waste-to-energy
industry is presented in Table 1.
The RBS
and PBS are then combined into the so-called Risk Package. The Risk Package
represents all key project variables derived through the PBS, identifies
whether and how they may be affected by each of the risk categories
identified in the RBS, and includes all information concerning the
parameters of each input variable (see Figure 4).
The Risk
Package is therefore both the starting point for any kind of risk analysis on
the project, from a simpler sensitivity analysis aimed at assessing the impact
of a single variable change on the project’s performance to a more
sophisticated stochastic analysis of the project cash flows. From the
lender’s viewpoint, the relevant risk package should only consider
residual risks remaining after the risk allocation and mitigation treatment.
3.2. Mendefinisikan variabel proyek dan
pendorong utama
Setelah strategi yang sama seperti Risk
Assessment, Struktur Breakdown Project (PBS) adalah dekomposisi top-down
hirarki yang bertujuan untuk mengidentifikasi semua variabel proyek mewakili
pendorong utama arus kinerja / kas proyek (Archibald, 2003). Salah satu contoh
dapat dilihat pada Gambar 3.
Masing-masing variabel utama proyek ini
kemudian dipecah lebih jauh ke dalam satu set rinci driver proyek yang mewakili
variabel input dari model arus kas. Sebuah contoh lengkap untuk kesepakatan
pembiayaan proyek dalam industri limbah-to-energi disajikan pada Tabel 1.
RBS dan PBS kemudian digabungkan ke
dalam apa yang disebut Paket Risiko. Paket Risiko mewakili semua variabel
proyek utama berasal melalui PBS, mengidentifikasi apakah dan bagaimana mereka
dapat dipengaruhi oleh masing-masing kategori risiko yang diidentifikasi di
RBS, dan mencakup semua informasi mengenai parameter masing-masing variabel
input (lihat Gambar 4).
Oleh karena itu, Paket Risiko adalah
baik titik awal untuk setiap jenis analisis risiko pada proyek, dari analisis
sensitivitas sederhana bertujuan untuk menilai dampak dari perubahan variabel
tunggal pada kinerja proyek untuk analisis stokastik lebih canggih dari arus
kas proyek. Dari sudut pandang pemberi pinjaman, paket risiko yang relevan
hanya harus mempertimbangkan risiko residu yang tersisa setelah alokasi risiko
dan pengobatan mitigasi.
3.3. Input
variables: estimation and data collection
After
identifying the key input variables, the range of admissible values and their frequency
distribution must be estimated and defined. The input data collection may be organised
using three methodologies:
historical
data analysis (when historical data about the required variable exist);
-
Expert judgements, obtained with techniques such as range
evaluation (Schuyler, 2001) or the event risk tree (Harrison, 1975);11
-
Hybrid models (combining historical and experts judgements).
3.3. Variabel input: estimasi dan
pengumpulan data
Setelah mengidentifikasi variabel input
utama, rentang nilai diterima dan distribusi frekuensi mereka harus diestimasi
dan didefinisikan. Pengumpulan data masukan dapat diatur menggunakan tiga
metodologi:
analisis data historis (bila data
historis tentang variabel yang dibutuhkan ada);
- Penilaian Ahli, diperoleh dengan
teknik seperti evaluasi jangkauan (Schuyler, 2001) atau pohon risiko peristiwa
(Harrison, 1975); 11
- Hybrid model (menggabungkan penilaian
sejarah dan ahli).
Hybrid
models are the most widely used, since the analyst would like to use historical
data whenever available, while many variables cannot be estimated only through historical
and objective data. In hybrid models, the data for risk variation range and variable
probability distribution are collected relying on both historical and expert information.
Experts begin by estimating input variables through a qualitative model, assigning
risk scores and also directly estimating the optimistic, pessimistic, and most likely
values of input variables. Judgments are independent, obtained through a Delphi
work session, and averages and variances of most likely, pessimistic and
optimistic values and risk scores are calculated.12 All available historical
data are included, and risk variables are clustered in some risk levels (see
Figures 5 and 6). Risk Levels define common probability shape distribution and
range variation, applicable to all groups belonging to the same level for each
risk category. In our example we defined five levels, but in principle it is
possible to define different levels for each single specific need (in theory, a
different distribution and/or fluctuation range could be assigned to each
variable).
Model hibrida yang paling banyak
digunakan, karena analis ingin menggunakan data historis bila tersedia,
sementara banyak variabel tidak dapat diperkirakan hanya melalui data historis
dan objektif. Dalam model hybrid, data untuk berbagai variasi risiko dan
distribusi probabilitas variabel yang dikumpulkan mengandalkan kedua informasi
sejarah dan ahli. Para ahli mulai dengan memperkirakan variabel input melalui
model kualitatif, menetapkan nilai risiko dan juga langsung memperkirakan
optimis, pesimis, dan kemungkinan besar nilai variabel input. Penghakiman yang
independen, yang diperoleh melalui sesi kerja Delphi, dan rata-rata dan varians
dari kemungkinan besar, nilai pesimis dan optimis dan skor risiko yang
calculated.12 Semua data historis yang tersedia termasuk, dan variabel risiko
yang berkerumun di beberapa tingkat risiko (lihat Gambar 5 dan 6). Tingkat
risiko probabilitas umum distribusi bentuk dan variasi jangkauan, berlaku untuk
semua kelompok yang tergabung ke tingkat yang sama untuk masing-masing kategori
risiko. Dalam contoh kita mendefinisikan lima tingkat, namun pada prinsipnya
adalah mungkin untuk menentukan tingkat yang berbeda untuk setiap kebutuhan
spesifik tunggal (dalam teori, distribusi yang berbeda dan / atau rentang
fluktuasi dapat ditugaskan untuk setiap variabel).
The next
step is to quantify the correlations between input variables, a task that is complex
to analyse and establish. Series of historical information should be available
to
calculate correlation factors, and some backtest analysis should be done to
establish their level of confidence. Moreover, additional hypotheses are needed
to maintain the same correlation values throughout all the years of project
life.
For some
financial variables, correlations may be estimated through historical data: this
is true for instance for the correlation between interest rate and inflation
rate,
between
inflation rate and raw material prices or output selling prices. Some historical
analyses are occasionally possible even among certain project drivers, like
erection time and construction costs. In any case, correlation analysis
typically focuses efforts only on those variables that have proven to have a
material impact on the cash flow model, and even in this case one should
clearly weigh the greater precision required by introducing correlation between
a pair of variables against the extra model risk implicit in the estimation of
correlation values.
Langkah selanjutnya adalah menghitung
korelasi antara variabel input, tugas yang kompleks untuk menganalisa dan
membangun. Seri informasi historis harus tersedia
untuk menghitung faktor korelasi, dan
beberapa analisis backtest harus dilakukan untuk menetapkan tingkat
kepercayaan. Selain itu, hipotesis tambahan diperlukan untuk mempertahankan
nilai korelasi yang sama di seluruh bertahun-tahun hidup proyek.
Untuk beberapa variabel keuangan,
korelasi dapat diperkirakan melalui data historis: ini benar misalnya untuk
korelasi antara tingkat suku bunga dan tingkat inflasi,
antara tingkat inflasi dan harga bahan
baku atau harga output jual. Beberapa analisis sejarah yang kadang-kadang
mungkin bahkan di antara driver proyek tertentu, seperti waktu ereksi dan biaya
konstruksi. Dalam kasus apapun, analisis korelasi biasanya memfokuskan upaya
hanya pada variabel yang telah terbukti memiliki dampak material pada model
arus kas, dan bahkan dalam kasus yang satu ini jelas harus mempertimbangkan
lebih presisi diperlukan dengan memperkenalkan korelasi antara sepasang
variabel terhadap extra model risiko tersirat dalam estimasi nilai korelasi.
The
estimation of input variables and the correlation among them is a critical
issue for outsiders, like bank lenders. In the business of project finance,
there are at least three different categories of outsiders suffering an
increasing level of asymmetric information relative to sponsors: the structured
finance or project finance team of the bank in charge of the customer
relationship, the risk management team, and finally the regulatory authorities
(who must decide whether the internal model developed by the bank could be used
to calculate minimum capital requirements for the deal as a substitute to the standard
approach). The project finance/structured finance team that typically builds a
complex worksheet to evaluate project cash flows in the base case and then
applies deterministic, what-if scenario sensitivity analysis may be at least
partially in a position to define reasonable estimates for the random variables
behind the cash flow model, using both past experience in other projects and
tapping external independent consultants (i.e. auditors or technical advisers)
who are often involved in certifying the base case analysis. The bank’s risk
manager should then check the assumptions so as to guarantee that the project
finance team has not underestimated the deal risk, either unintentionally or
(worse) deliberately for budgetary reasons. Supervisors, finally, should
control whether the bank’s internal VaR estimate is adequate, or whether the
project finance or risk management team have been over optimistic in their
evaluation.
Of
course, the efforts to develop an internal model for project finance deals
requires a noticeable investment in project evaluation skills, since they are
required not only in the team responsible for evaluating the deal first (as
would happen even if a standard approach for calculating capital charge were
adopted) but also in the risk management unit, which should be able to question
and revise the assumptions behind the risk assessment of the project finance
unit inside the bank.
Estimasi variabel input dan korelasi
antara mereka adalah masalah penting bagi orang luar, seperti bank pemberi
pinjaman. Dalam bisnis pembiayaan proyek, setidaknya ada tiga kategori yang
berbeda dari orang luar yang menderita tingkat peningkatan informasi asimetris
relatif terhadap sponsor: tim keuangan keuangan atau proyek terstruktur bank
yang bertanggung jawab atas hubungan pelanggan, tim manajemen risiko, dan
akhirnya pihak yang berwenang (yang harus memutuskan apakah internal model yang
dikembangkan oleh bank dapat digunakan untuk menghitung kebutuhan modal minimum
untuk kesepakatan sebagai pengganti pendekatan standar). Pembiayaan proyek /
tim keuangan terstruktur yang biasanya membangun lembar kerja yang kompleks
untuk mengevaluasi arus kas proyek dalam kasus dasar dan kemudian berlaku
deterministik, apa-jika analisis sensitivitas skenario mungkin setidaknya
sebagian dalam posisi untuk menentukan taksiran yang wajar untuk variabel acak
belakang model arus kas, menggunakan kedua pengalaman masa lalu dalam
proyek-proyek lain dan menekan konsultan independen eksternal (misalnya auditor
atau penasihat teknis) yang sering terlibat dalam sertifikasi analisis kasus
dasar. Manajer risiko bank harus mengecek asumsi sehingga menjamin bahwa tim
keuangan proyek belum meremehkan risiko kesepakatan, baik sengaja atau (lebih
buruk) sengaja karena alasan anggaran. Supervisor, akhirnya, harus mengontrol apakah
estimasi VaR internal bank cukup, atau apakah tim keuangan proyek atau
manajemen risiko telah lebih optimis dalam evaluasi mereka.
Tentu saja, upaya untuk mengembangkan
model internal untuk penawaran pembiayaan proyek membutuhkan investasi nyata dalam
keterampilan evaluasi proyek, karena mereka dituntut tidak hanya dalam tim yang
bertanggung jawab untuk mengevaluasi kesepakatan pertama (seperti yang akan
terjadi bahkan jika pendekatan standar untuk menghitung modal biaya diadopsi),
tetapi juga di unit manajemen risiko, yang harus mampu mempertanyakan dan
merevisi asumsi di balik penilaian risiko dari unit pembiayaan proyek dalam
bank
3.4. Modelling
project cash flows, calculating output and valuing results
The cash
flow model, if fed with appropriate inputs, defines the basis for supporting lenders’
decisions in terms of risk valuation and pricing (spreads, fees and minimum acceptable
internal rate of return). Traditional risk valuation is based on a definition
of a base case and a repeated output stress analysis or subjective scenario
analysis. The base case analysis defines an integrated forecast of balance
sheets, income statements and cash flow statements for all the years in which
the project is operated, conditioned on a number of assumptions. An example of
cash flow statements for the first seven years of operating life referred to
the waste-to-energy plant project whose input variables are listed in Table 1
is shown in Table 2.
In a
traditional repeated output stress analysis, a shock is applied to one project driver
(within a predetermined range), while all the others are kept fixed. In the
case of scenarios, a set of variables is changed and the effect of the
behaviour of project cash flow is then assessed. A stochastic analysis,
instead, allows all (or at least most of) the input variables to vary
simultaneously. For instance, in the example in Table 2, revenues from waste
elimination may vary from year to year depending on the usage of the plant’s production
capacity, and on the potential variability of the fees for waste elimination which
may be indexed to inflation. Other cashflow components will vary according to
the probability distributions specified by the analyst, and as a result a
probabilistic distribution of all output variables will be obtained, so as to
allow sponsors’ and lenders’ advisers to carry out a regression analysis of
model inputs (see Figure 7).
3.4. Pemodelan arus kas proyek,
menghitung output dan menilai hasil
Model arus kas, jika makan dengan input
yang tepat, mendefinisikan dasar untuk mendukung keputusan pemberi pinjaman
dalam hal penilaian risiko dan penetapan harga (spread, biaya dan internal rate
of return minimum yang dapat diterima). Penilaian risiko tradisional didasarkan
pada definisi kasus dasar dan analisa tegangan output yang berulang atau
analisis skenario subjektif. Analisis kasus dasar mendefinisikan perkiraan
terpadu neraca, laporan laba rugi dan laporan arus kas untuk tahun-tahun di
mana proyek dioperasikan, dikondisikan pada sejumlah asumsi. Contoh laporan
arus kas selama tujuh tahun pertama kehidupan operasi disebut proyek pembangkit
limbah-to-energi yang input variabel yang tercantum dalam Tabel 1 dapat dilihat
pada Tabel 2.
Dalam analisa tegangan output yang
tradisional diulang, kejutan diterapkan untuk satu driver proyek (dalam kisaran
yang telah ditentukan), sementara semua yang lain terus tetap. Dalam kasus
skenario, satu set variabel berubah dan pengaruh perilaku arus kas proyek ini
kemudian dinilai. Sebuah analisis stokastik, sebaliknya, memungkinkan semua
(atau setidaknya sebagian besar) variabel input bervariasi secara bersamaan.
Misalnya, dalam contoh pada Tabel 2, pendapatan dari limbah eliminasi dapat
bervariasi dari tahun ke tahun tergantung pada penggunaan kapasitas produksi
pabrik, dan variabilitas potensi biaya untuk limbah eliminasi yang dapat
diindeks terhadap inflasi. Komponen arus kas lainnya akan bervariasi sesuai
dengan distribusi probabilitas yang ditentukan oleh analis, dan sebagai
hasilnya distribusi probabilistik semua variabel output akan diperoleh,
sehingga memungkinkan sponsor dan pemberi pinjaman penasihat untuk melakukan
analisis regresi input Model ( lihat Gambar 7).
This
regression is relevant since it more clearly explains which variables have a substantial
impact on the final performance of the project and which variables are less relevant.
This may also require the analysis to be refined by challenging or further improving
the estimates on those variables that appeared to have a major role after the simulation
is run.
Regresi ini relevan karena lebih jelas
menjelaskan variabel yang memiliki dampak besar pada kinerja akhir dari proyek
dan variabel yang kurang relevan. Hal ini juga mungkin memerlukan analisis yang
akan disempurnakan dengan menantang atau lebih meningkatkan perkiraan pada
variabel-variabel yang ternyata memiliki peran utama setelah simulasi
dijalankan.
4. From
Stochastic Simulations to VaR
By developing
a sophisticated stochastic model of future cash flows, the lender may be able
to determine how frequently the project may reach a situation that can be
identified as a default, according to the stepwise process discussed in Figure
1. While the overall default probability throughout the life of the project may
be relevant information for the risk manager, a bank is typically interested in
determining a VaR measure over a much shorter horizon (typically one year). It
is therefore critical to clearly define which notion of value the bank is
willing to adopt, and how the deterioration of project cash flows could impact
that measure. VaR would then be identified with the maximum potential loss the
value of the project may face within a certain confidence level and time
horizon (presumably equal to one year).
4. Dari Stochastic Simulasi ke VaR
Dengan mengembangkan model stokastik
canggih arus kas masa depan, pemberi pinjaman mungkin dapat menentukan seberapa
sering proyek dapat mencapai situasi yang dapat diidentifikasi sebagai default,
menurut proses bertahap dibahas dalam Gambar 1. Sedangkan probabilitas standar
secara keseluruhan di seluruh umur proyek mungkin informasi yang relevan bagi
manajer risiko, bank biasanya tertarik untuk menentukan ukuran VaR atas
cakrawala jauh lebih pendek (biasanya satu tahun). Oleh karena itu penting
untuk secara jelas mendefinisikan mana gagasan nilai bank bersedia untuk
mengadopsi, dan bagaimana kerusakan arus kas proyek dapat mempengaruhi ukuran
itu. VaR kemudian akan diidentifikasi dengan potensi kerugian maksimum nilai
proyek mungkin menghadapi dalam tingkat kepercayaan tertentu dan horizon waktu
(mungkin sama dengan satu tahun).
A first
simplified solution could be to adopt the approach of default-mode credit risk
VaR models, which typically assume that the value of the loan should be equal to
its notional value except in case of default, and therefore identify the risk
over the one-year horizon only with the risk that the project may default
during the first year. Yet, since the debt service could be distributed in many
different ways along the life of the project provided that minimum DSCR and
LLCR are satisfied, this view could be misleading: when structuring the
project, reducing debt service requirements in the early years would reduce the
first-year default probability of the project, almost irrespective of its true
quality and probability of default in subsequent years. At the same time, VaR estimates
would fluctuate from year to year only as a consequence of changes in debt service
requirements from year to year (assuming, of course, all else being equal). Consequently,
this solution should be rejected.
Sebuah solusi sederhana pertama bisa
mengadopsi pendekatan model VaR risiko kredit default-mode, yang biasanya
menganggap bahwa nilai pinjaman harus sama dengan nilai nosional perusahaan
kecuali dalam kasus default, dan karena itu mengidentifikasi risiko atas satu-
tahun cakrawala hanya dengan resiko bahwa proyek mungkin default selama tahun
pertama. Namun, karena utang dapat didistribusikan dalam berbagai cara
sepanjang masa proyek asalkan minimal DSCR dan LLCR puas, pandangan ini bisa
menyesatkan: ketika menyusun proyek, mengurangi kebutuhan pembayaran hutang di
tahun-tahun awal akan mengurangi probabilitas pertama tahun default proyek,
hampir terlepas dari kualitas yang benar dan probabilitas default di
tahun-tahun berikutnya. Pada saat yang sama, perkiraan VaR akan berfluktuasi
dari tahun ke tahun hanya sebagai konsekuensi dari perubahan dalam persyaratan
utang dari tahun ke tahun (dengan asumsi, tentu saja, semua sederajat). Akibatnya,
solusi ini harus ditolak.
Another possible
solution is to adopt a mark-to-market approach where VaR is identified as the
difference between the loan’s forward expected value and its forward value in
one year’s time in the worst-case scenario at the ×% level. The critical issue
here becomes how the forward value of the loan can be estimated. In a classic CreditmetricsTM-like
model,16 the forward value of the loan would be identified by discounting the
value of future cash flows with forward zero coupon rates incorporating a
proper spread for credit risk. For a bond, for instance, the variability of the
forward price derives from the fact that cash flows are discounted at different
rates depending on the rating class in which the issuer ends up at the end of
the year, according to a predefined rating transition matrix. Trying to apply
similar logic to project finance deals is not easy. For a bond, the proper
discounting rate can be determined based on its rating class. For a project
finance deal, modelling the relationship between theoretical credit spreads and
the project’s behaviour is instead much more complex.
Solusi lain yang mungkin adalah untuk
mengadopsi pendekatan mark-to-market di mana VaR diidentifikasi sebagai
perbedaan antara nilai depan diharapkan kredit dan nilai maju dalam waktu satu
tahun dalam skenario terburuk pada tingkat ×%. Isu penting di sini menjadi
bagaimana nilai depan pinjaman dapat diperkirakan. Dalam model CreditmetricsTM
seperti klasik, 16 nilai depan pinjaman akan diidentifikasi dengan
mendiskontokan nilai arus kas masa depan dengan depan nol tingkat kupon
menggabungkan penyebaran tepat untuk risiko kredit. Untuk obligasi, misalnya,
variabilitas harga ke depan berasal dari fakta bahwa arus kas didiskontokan
pada tingkat yang berbeda tergantung pada kelas Peringkat di mana penerbit
berakhir pada akhir tahun, menurut rating yang telah ditetapkan matriks
transisi . Mencoba menerapkan logika yang sama untuk proyek transaksi keuangan
tidak mudah. Untuk obligasi, tingkat diskonto yang tepat dapat ditentukan
berdasarkan kelas rating. Untuk kesepakatan pembiayaan proyek, pemodelan
hubungan antara spread kredit teoritis dan perilaku proyek adalah bukan jauh
lebih kompleks.
Considering
these problems, a third possible solution is to assume that the credit spread
may remain the same for the next year and to model the distribution of the forward
values of the project by simply discounting the cash flows for debt service repayment
in each simulation run. Therefore, in all simulation runs where the project will
default (according to the definition outlined in section 2), the present value
of the cash flows will be lower than in non-default scenarios. This implies
that a distribution of loan values for the lender may be built that would
enable the lenders to calculate both the expected loss (i.e. the difference
between the value of the loan in the case of non-default and its expected
value) and VaR or the unexpected loss (i.e., the difference between the
expected value and the worst case scenario value within a given confidence level),
plus any other risk measure (such as expected shortfall) that may be considered
useful. This solution offers the advantage of linking the value of the loan to
the timing of potential default, since a late default would imply a greater
number of years with regular payments.
Mengingat masalah ini, solusi ketiga
yang mungkin adalah untuk menganggap bahwa penyebaran kredit dapat tetap sama
untuk tahun depan dan untuk model distribusi nilai-nilai ke depan proyek hanya
mendiskontokan arus kas untuk pembayaran utang dalam setiap simulasi
dijalankan. Oleh karena itu, dalam semua berjalan simulasi di mana proyek akan
default (menurut definisi yang diuraikan dalam bagian 2), nilai sekarang dari
arus kas akan lebih rendah daripada dalam skenario non-standar. Ini berarti
bahwa distribusi nilai pinjaman untuk pinjaman dapat dibangun yang akan
memungkinkan kreditur untuk menghitung baik kerugian yang diharapkan (yaitu
perbedaan antara nilai pinjaman dalam kasus non-default dan nilai yang
diharapkan) dan VaR atau kerugian tak terduga (yaitu, perbedaan antara nilai
yang diharapkan dan nilai skenario kasus terburuk dalam tingkat kepercayaan
tertentu), ditambah ukuran risiko lain (seperti kekurangan diharapkan) yang
dapat dianggap berguna. Solusi ini menawarkan keuntungan dari menghubungkan
nilai pinjaman dengan waktu potensial default, karena default akhir akan
berarti lebih banyak tahun dengan pembayaran reguler.
In cases
where default occurs, a critical issue is how to model the project value in the
event of default. This is important since the left side of the distribution of
the loan’s forward present value would be determined precisely by the cases in
which the project will be totally or
partially unable to cover its debt service and will meet the conditions described
earlier in Section 2. This problem is discussed in the next section.
Dalam kasus
di mana standar terjadi, isu penting adalah bagaimana model nilai proyek dalam
hal default. Hal ini penting karena sisi kiri distribusi nilai sekarang maju
pinjaman ini akan ditentukan secara tepat oleh kasus di mana proyek akan total
atau sebagian tidak dapat menutupi utang dan akan memenuhi kondisi yang
dijelaskan sebelumnya dalam Bagian 2. Ini masalah yang dibahas dalam bagian
berikutnya
5.
Defining Project Value in the Event of Default
Provided
that the definition of the default event proposed in section 2 is acceptable,
it is necessary to estimate the loss given default (LGD) or,
equivalently, the recovery rate for the banks financing the project. The
recovery rate clearly depends on the value of the project in the event
of default, which could be represented either by the market value of the
underlying asset (as, for example, in the case of a real estate or aircraft
industry project) or by the present value of future cash flows. In a
Monte Carlo setting, one could adopt different solutions depending on
the characteristics of the individual project and the degree of
precision that sponsors or lenders wish to attain. There are in particular three
critical choices, related to: (1) whether and how the random nature of loss
given default is taken into account; (2) how the value of the project at
default is modelled; (3) how to consider the case of debt restructuring.
These
three problems are now analysed in sequence.
5. Mendefinisikan Nilai Proyek di
Wanprestasi
Asalkan definisi default event yang
diusulkan dalam bagian 2 dapat diterima, maka perlu untuk memperkirakan
kerugian given default (LGD) atau, dengan kata lain, tingkat pemulihan bagi
bank pembiayaan proyek. Tingkat pemulihan jelas tergantung pada nilai proyek
dalam hal default, yang dapat diwakili baik oleh nilai pasar dari aset yang mendasari
(seperti, misalnya, dalam kasus real estate atau industri pesawat terbang
proyek) atau dengan nilai sekarang dari arus kas masa depan. Dalam pengaturan
Monte Carlo, orang bisa mengadopsi solusi yang berbeda tergantung pada
karakteristik dari proyek individu dan tingkat presisi yang sponsor atau
pemberi pinjaman ingin mencapai. Ada khususnya tiga pilihan penting, terkait
dengan: (1) apakah dan bagaimana sifat acak loss given default diperhitungkan;
(2) bagaimana nilai proyek di default dimodelkan; (3) bagaimana untuk
mempertimbangkan kasus restrukturisasi utang.
Ketiga masalah sekarang dianalisis
secara berurutan.
5.1. Deterministic
vs. stochastic LGD estimates
When
modelling the value of the project in the event of default, assuming a fixed
LGD percentage value is clearly the easiest choice. However, the risk of the
project finance deal may be underestimated, since there is frequently a
positive correlation between probability of default and LGD. Since the value of
the project often depends only on the value of the future cash flows that will
be produced (except in those cases where there is a redeployable underlying
asset), a reduction in the value of future cash flows has the joint impact of
increasing the probability of default (e.g. by falling below a certain critical
threshold value in DSCR or LLCR or both, as discussed in section 2) and
reducing the present value of the cash flows after default, thereby reducing
the recovery ratio for the banks that financed the project. A fixed percentage
LGD would instead ignore the risk deriving from LGD variability and its
correlation with the event of default and could therefore underestimate actual
risk.
5.1. Deterministik vs perkiraan
stokastik LGD
Ketika pemodelan nilai proyek dalam hal
default, dengan asumsi LGD nilai persentase tetap jelas merupakan pilihan
termudah. Namun, risiko kesepakatan pembiayaan proyek dapat dianggap remeh,
karena ada sering korelasi positif antara probabilitas default dan LGD. Karena
nilai proyek sering hanya bergantung pada nilai arus kas masa depan yang akan diproduksi
(kecuali dalam kasus-kasus di mana ada aset yang mendasari redeployable),
penurunan nilai arus kas masa depan memiliki dampak gabungan meningkatkan
probabilitas default (misalnya dengan jatuh di bawah nilai ambang batas kritis
tertentu dalam DSCR atau LLCR atau keduanya, seperti yang dibahas dalam bagian
2) dan mengurangi nilai sekarang dari arus kas setelah default, sehingga
mengurangi rasio pemulihan untuk bank-bank yang membiayai proyek. Persentase
LGD tetap malah akan mengabaikan risiko yang berasal dari variabilitas LGD dan
korelasinya dengan peristiwa default dan karena itu bisa meremehkan risiko yang
sebenarnya.
The second
solution could be to simulate one single random LGD value if default occurs,
either by extracting a random value from the distribution modelling the market value
of the redeployable underlying asset in case it exists, or by continuing the simulation
of the project cash flows after default and then summing their NPVs. The recovery
rate would then be represented by the ratio of either the market value of the
underlying asset or the aggregate net present value of future discounted cash
flows to the value of outstanding debt, and hence the loss given default would
be easily determined. If this solution is adopted, the effect of the uncertain
loss given default rate, and the correlation between PD and LGD deriving from
the reduction of project cash flows could be modelled. Yet, for each default a
single, albeit random, value of loss given default is considered. Therefore,
reflecting the variability of LGD in VaR estimates would probably require
running a huge number of simulations, especially if default occurs very
infrequently.
Solusi kedua bisa untuk mensimulasikan
satu nilai tunggal acak LGD jika standar terjadi, baik dengan mengekstraksi
nilai acak dari distribusi pemodelan nilai pasar dari aset yang mendasari
redeployable dalam kasus itu ada, atau dengan melanjutkan simulasi arus kas
proyek setelah bawaan dan kemudian menjumlahkan NPV mereka. Tingkat pemulihan
kemudian akan diwakili oleh rasio baik nilai pasar dari aset yang mendasari
atau nilai bersih agregat masa depan diskon arus kas dengan nilai hutang, dan
karenanya kerugian given default akan mudah ditentukan. Jika solusi ini
diadopsi, efek dari hilangnya diberikan tingkat standar pasti, dan korelasi antara
PD dan LGD berasal dari pengurangan arus kas proyek dapat dimodelkan. Namun,
untuk setiap bawaan satu, meskipun random, nilai kerugian given default
dianggap. Oleh karena itu, mencerminkan variabilitas LGD dalam perkiraan VaR
mungkin akan memerlukan menjalankan sejumlah besar simulasi, terutama jika
standar terjadi sangat jarang
In order
to solve this problem, a third possible solution is first to run a project simulation
that identifies the scenarios when default occurs, and then run a set of
subsimulations for each default scenario aimed at building a distribution of
LGD values.20 This solution is more complex, and it is viable especially when
either default is rare (so that the number of sub-simulations is lower), or the
LGD is easy to model, as it happens
when it
can be derived directly by simulating the value of the underlying asset.
Despite the effort required, this solution may be useful when the bank is
interested in measuring VaR up to an extreme percentile of the distribution
(e.g. 99.97%), which could also be more sensitive to the variability of the LGD
rate.
Untuk mengatasi masalah ini, solusi
ketiga yang mungkin adalah pertama untuk menjalankan simulasi proyek yang
mengidentifikasi skenario ketika standar terjadi, dan kemudian menjalankan
serangkaian subsimulations untuk setiap skenario standar yang bertujuan
membangun distribusi LGD values.20 Solusi ini lebih kompleks, dan itu layak
terutama ketika salah default adalah langka (sehingga jumlah sub-simulasi lebih
rendah), atau LGD mudah untuk model, seperti yang terjadi
ketika dapat diturunkan secara langsung
dengan mensimulasikan nilai aset yang mendasari. Meskipun upaya yang
diperlukan, solusi ini mungkin berguna ketika bank tertarik dalam mengukur VaR
hingga satu persentil ekstrim distribusi (misalnya 99,97%), yang juga bisa
menjadi lebih sensitif terhadap variabilitas tingkat LGD.
5.2. LGD
drivers: redeployable underlying assets versus defaulted project cash flows
The
second issue related to the estimation of loan value in case of default
concerns the drivers used to simulate one or more recovery values for the
project. When the project has an underlying asset that could be sold in case of
project default, the easiest way would be to model the recovery rate by
extracting one or more random values from the distribution of the underlying
asset values. A simple case is represented, for instance, by real estate
projects. In this case estimating the LGD value is faster, since one could extract
a single value instead of prosecuting a cash flow projection.
5.2. Driver LGD: underlying asset
redeployable dibandingkan arus kas proyek macet
Isu kedua terkait dengan estimasi nilai
pinjaman dalam kasus default menyangkut driver yang digunakan untuk
mensimulasikan satu atau lebih nilai recovery untuk proyek tersebut. Ketika
proyek ini memiliki underlying asset yang dapat dijual dalam kasus default
proyek, cara termudah adalah dengan model tingkat pemulihan dengan mengekstraksi
satu atau lebih acak nilai dari distribusi nilai underlying asset. Sebuah kasus
sederhana diwakili, misalnya, oleh proyek-proyek real estate. Dalam hal ini
memperkirakan nilai LGD lebih cepat, karena salah satu dapat mengambil nilai
tunggal bukannya menuntut proyeksi arus kas
On the
other hand, if there is no redeployable underlying asset, then the value in
case of default could be modelled by continuing the cash flow simulation even
beyond the default event. In this case, the underlying assumption is that the
lenders would prefer to extract the (albeit insufficient) residual cash flows
rather than terminate the project completely with a zero recovery rate. Yet, it
is critical to decide whether the credit spread used to discount the project’s
post-default cash flows may still be assumed to equal the initial credit
spread. If a different credit spread is adopted, then the project’s value in the
case of default would also depend on the changes in the discount rate that may
be triggered by the default event.
Di sisi lain, jika tidak ada underlying
asset redeployable, maka nilai dalam kasus default dapat dimodelkan dengan
melanjutkan simulasi arus kas bahkan di luar acara default. Dalam hal ini,
asumsi yang mendasari adalah bahwa pemberi pinjaman akan lebih memilih untuk
mengekstrak (meskipun tidak cukup) arus kas sisa daripada menghentikan proyek
sepenuhnya dengan tingkat nol pemulihan. Namun, sangat penting untuk memutuskan
apakah penyebaran kredit yang digunakan untuk mendiskontokan arus kas
pasca-default proyek masih dapat diasumsikan sama dengan spread kredit awal.
Jika spread kredit yang berbeda diadopsi, maka nilai proyek dalam kasus default
juga akan tergantung pada perubahan tingkat diskonto yang mungkin dipicu oleh
peristiwa default.
5.3 Restructuring
vs. Default
A third
issue in modelling the distribution of the loan forward value is whether and
how to consider the possibility that the debt may be restructured. In
fact, it is reasonable to assume that under certain circumstances the
pool of financial institutions supporting the project might accept debt
restructuring rather than allow the project to default. This assumption,
also confirmed in practice (Esty and Sesia, 2004), is consistent with the fact
that practitioners consider the breach of covenants in loan agreements as a
trigger forcing lenders to take proper measures to prevent the project’s
ability to generate cash from declining. When a default event included
in the loan agreement occurs, the immediate cancellation of the loan –
although possible in principle – would determine a severe drop in the
value of the project. The lenders, well aware of this consequence, will tend to
take corrective actions aimed at keeping the project in operation as a
going concern. For example, in the case of a step-in clause, which
allows lenders to select another operator for a project-financed
industrial plant and substitute it for the existing one, continuation is
safeguarded by avoiding the bankruptcy of the project. The maturity of the deal
is obviously modified: the renegotiation can actually lengthen the terms
of repayment of capital, interests and fees. If this possibility is
entered into the simulation, then one should try to model a sort of loss given
restructuring, since a refinancing agreement, or the conversion of debt into
equity, could also imply a loss for the lenders.
5.3
Restrukturisasi vs default
Masalah
ketiga dalam pemodelan distribusi nilai pinjaman ke depan adalah apakah dan
bagaimana untuk mempertimbangkan kemungkinan bahwa utang dapat
direstrukturisasi. Bahkan, masuk akal untuk mengasumsikan bahwa dalam keadaan
tertentu kolam lembaga keuangan yang mendukung proyek tersebut mungkin menerima
restrukturisasi utang daripada membiarkan proyek ke default. Asumsi ini, juga
menegaskan dalam praktek (Esty dan Sesia, 2004), konsisten dengan fakta bahwa
praktisi mempertimbangkan pelanggaran perjanjian dalam perjanjian pinjaman
sebagai pemicu memaksa pemberi pinjaman untuk mengambil langkah yang tepat
untuk mencegah kemampuan proyek untuk menghasilkan uang dari penurunan. Ketika
acara standar termasuk dalam perjanjian pinjaman terjadi, pembatalan langsung
dari pinjaman - meskipun mungkin pada prinsipnya - akan menentukan penurunan
berat pada nilai proyek. Para pemberi pinjaman, sangat menyadari konsekuensi
ini, akan cenderung untuk mengambil tindakan korektif yang ditujukan untuk
menjaga proyek beroperasi secara berkelanjutan. Sebagai contoh, dalam kasus
langkah-dalam ayat, yang memungkinkan pemberi pinjaman untuk memilih operator
lain untuk pabrik industri proyek yang dibiayai dan menggantikannya untuk yang
sudah ada, kelanjutan dijaga dengan menghindari kebangkrutan proyek. Kematangan
kesepakatan jelas dimodifikasi: renegosiasi benar-benar dapat memperpanjang hal
pembayaran kembali modal, kepentingan dan biaya. Jika kemungkinan ini
dimasukkan ke dalam simulasi, maka salah satu harus mencoba untuk model semacam
kerugian diberikan restrukturisasi, karena perjanjian refinancing, atau
konversi utang menjadi ekuitas, juga bisa menyiratkan kerugian bagi kreditur.
Incorporating
restructuring events into the simulation requires first determining (as in
the case of default) reasonable restructuring triggers that can be based on
DSCR and LLCR, as discussed in Section 2. Even if the triggers are
reached, restructuring is not automatic, since it typically requires the
acceptance by all the lenders. So the
likelihood
of restructuring may also depend on the number of lenders and the strength of
the arranger that acts as the leader of the refinancing (Esty and Megginson,
2003). Then, provided that restructuring occurs, the forms it takes may vary so
much that it is hard to model them formally. Developing this feature in
simulation experiments may also be a challenge for more sophisticated risk
managers.
Memasukkan peristiwa restrukturisasi
dalam simulasi membutuhkan pertama menentukan (seperti dalam kasus default)
pemicu restrukturisasi wajar yang dapat didasarkan pada DSCR dan LLCR, seperti
yang dibahas dalam Bagian 2. Bahkan jika pemicu tercapai, restrukturisasi tidak
otomatis, karena biasanya membutuhkan penerimaan oleh seluruh kreditur. Jadi
kemungkinan restrukturisasi mungkin juga tergantung pada jumlah pinjaman dan
kekuatan pengatur yang bertindak sebagai pemimpin refinancing (Esty dan
Megginson, 2003). Kemudian, asalkan restrukturisasi terjadi, bentuk-bentuk yang
diperlukan dapat bervariasi begitu banyak sehingga sulit untuk model mereka
secara resmi. Mengembangkan fitur ini dalam percobaan simulasi juga dapat
menjadi tantangan bagi manajer risiko yang lebih canggih.
6. Implications
and Conclusions
Despite
the relevance of the project finance market, so far a formal model to measure
the potential losses for lenders supporting project finance deals has not
been formally developed. The contribution of this paper is to suggest
how VaR for project finance deals may be measured through Monte Carlo
simulation, by discussing how default risk could be defined and a loss
distribution could be derived. As discussed in Sections 4 and 5, even
after cash flows have been simulated there may be various choices of howto
identify VaR. The simulations can obviously be built with different
degrees of complexity, which relate both to the number of the drivers
that are considered when modelling cash flow projections and the level
of sophistication in modelling default and restructuring events and
their consequences for the value of the loan. While the sophistication of the
model may likely depend in practice on the size of the transaction and
the experience of the evaluator, the approach suggested in this paper
may be useful for both sponsors and lenders to better evaluate the risk
of the project and to support a careful risk allocation. Analysing in particular the implications
for the lenders, that represent the main focus of our analysis, they can
be summarised as follows. First, they can use stochastic analysis as a
substitute for scenario-based sensitivity analysis and derive through
simulation (and not only through intuition) the combination of key
variables that represent critical scenarios for the project. Second,
they could use this methodology to support an internal model for
determining capital requirements for project finance deals that (besides being
more favourable, perhaps, than the standard approach) would provide the
risk manager with a clearer measure of the real risk level of the deal.
This, in turn, would provide the opportunity to obtain more precise,
risk-adjusted pricing for the deal. Incidentally, the fact that the
simulation may impact pricing may also be a means to obtain more and better
data from the sponsor, who is typically in the best position to evaluate the
project cash flows. Broader information disclosure by the sponsor may
produce more favourable pricing, giving him a significant incentive to cooperate
more closely with the lender as far as input variable distributions are
concerned. Finally, a simulation approach may also be used to discuss
and evaluate with the sponsor the structure for allocating risk among
the various parties involved in the deal, and to check the effects of
alternative risk transfer or hedging arrangements.
6. Implikasi dan Kesimpulan
Meskipun relevansi pasar pembiayaan
proyek, sejauh model formal untuk mengukur potensi kerugian bagi kreditur
mendukung penawaran pembiayaan proyek belum secara resmi dikembangkan.
Kontribusi dari makalah ini adalah untuk menunjukkan bagaimana VaR untuk
penawaran pembiayaan proyek dapat diukur melalui simulasi Monte Carlo, dengan
membahas bagaimana risiko gagal bayar dapat didefinisikan dan distribusi
kerugian bisa diturunkan. Sebagaimana dibahas dalam Bagian 4 dan 5, bahkan
setelah arus kas disimulasikan mungkin ada berbagai pilihan howto
mengidentifikasi VaR. Simulasi jelas dapat dibangun dengan derajat yang berbeda
kompleksitas, yang berhubungan baik dengan jumlah driver yang dianggap ketika
model proyeksi arus kas dan tingkat kecanggihan dalam pemodelan standar dan
acara dan konsekuensinya restrukturisasi untuk nilai pinjaman. Sementara
kecanggihan model mungkin mungkin tergantung dalam praktek pada ukuran
transaksi dan pengalaman evaluator, pendekatan yang disarankan dalam makalah
ini mungkin berguna bagi sponsor dan pemberi pinjaman untuk lebih mengevaluasi
risiko proyek dan untuk mendukung alokasi risiko yang cermat. Menganalisis
khususnya implikasi bagi pemberi pinjaman, yang mewakili fokus utama analisis
kami, mereka dapat diringkas sebagai berikut. Pertama, mereka dapat menggunakan
analisis stokastik sebagai pengganti analisis sensitivitas berbasis skenario
dan berasal melalui simulasi (dan tidak hanya melalui intuisi) kombinasi
variabel kunci yang mewakili skenario penting untuk proyek tersebut. Kedua,
mereka bisa menggunakan metodologi ini untuk mendukung model internal untuk
menentukan kebutuhan modal untuk penawaran pembiayaan proyek yang (selain lebih
menguntungkan, mungkin, dibandingkan dengan pendekatan standar) akan memberikan
manajer risiko dengan ukuran yang lebih jelas tentang tingkat risiko nyata dari
menangani. Hal ini, pada gilirannya, akan memberikan kesempatan untuk
mendapatkan lebih tepat, risiko disesuaikan harga untuk kesepakatan. Kebetulan,
fakta bahwa simulasi dapat mempengaruhi harga juga dapat menjadi sarana untuk
mendapatkan lebih banyak dan lebih baik data dari sponsor, yang biasanya dalam
posisi terbaik untuk mengevaluasi arus kas proyek. Keterbukaan informasi yang
lebih luas oleh sponsor dapat menghasilkan harga yang lebih menguntungkan, memberinya
insentif yang signifikan untuk bekerja sama lebih erat dengan pemberi pinjaman
sejauh masukan distribusi variabel yang bersangkutan. Akhirnya, pendekatan
simulasi juga dapat digunakan untuk membahas dan mengevaluasi dengan sponsor
struktur untuk mengalokasikan resiko di antara berbagai pihak yang terlibat
dalam kesepakatan tersebut, dan untuk memeriksa efek dari transfer risiko
alternatif atau pengaturan lindung nilai
Of
course, the possible adoption of more complex approaches also requires
developing the ability to check the model structure and its key assumptions.
This is relevant both inside the bank and for supervisors who may be asked to
validate internal models. Despite the unavoidable simplifications that the
first efforts may require, and the intrinsic uncertainty of the projects (which
may be modelled but not certainly eliminated), the approach presented here
could be valuable for better estimating project risks from the standpoint of
both the structured finance departments and the risk management departments
inside a bank. The need to build a simulation model may even help control the
internal evaluation and pricing process, considering that it implies a clearer statement
of the assumptions concerning the risk drivers of the deal and provides both the
unit responsible for the lending decision and the risk manager with an estimated
full distribution of possible outcomes. Through time, this may enable the risk
manager to check the internal rating assignment process much better than if it
were based on qualitative judgements only. In a word, a simulation approach,
albeit complex, should be seen not as a complex approach to a simple
transaction but rather simply as a method for properly handling the inherent
complexity typical of most project finance deals.
Tentu saja, kemungkinan adopsi
pendekatan yang lebih kompleks juga membutuhkan mengembangkan kemampuan untuk
memeriksa struktur model dan asumsi utamanya. Hal ini relevan baik di dalam
bank dan pengawas yang mungkin diminta untuk memvalidasi model internal.
Meskipun penyederhanaan tidak dapat dihindari bahwa upaya pertama mungkin memerlukan,
dan ketidakpastian intrinsik proyek (yang dapat dimodelkan tetapi tidak pasti
dihilangkan), pendekatan yang disajikan di sini dapat bermanfaat bagi risiko
proyek memperkirakan lebih baik dari sudut pandang dari kedua departemen
keuangan terstruktur dan departemen manajemen risiko dalam bank. Kebutuhan
untuk membangun model simulasi bahkan dapat membantu mengontrol evaluasi
internal dan proses penetapan harga, mengingat bahwa itu menyiratkan pernyataan
yang lebih jelas dari asumsi tentang driver risiko kesepakatan dan menyediakan
unit yang bertanggung jawab untuk keputusan pinjaman dan manajer risiko dengan
diperkirakan distribusi penuh hasil yang mungkin. Melalui waktu, hal ini dapat
memungkinkan manajer risiko untuk memeriksa proses Peringkat tugas internal
yang jauh lebih baik daripada jika didasarkan pada penilaian kualitatif saja.
Dalam kata, pendekatan simulasi, meskipun kompleks, harus dilihat bukan sebagai
pendekatan yang kompleks untuk transaksi yang sederhana melainkan hanya sebagai
metode untuk benar menangani kompleksitas yang melekat khas dari sebagian besar
transaksi keuangan proyek
Tidak ada komentar:
Posting Komentar